Summary
France’s Flamanville 3 nuclear reactor, its most powerful at 1,600 MW, was connected to the grid on December 21 after 17 years of construction plagued by delays and budget overruns.
The European Pressurized Reactor (EPR), designed to boost nuclear energy post-Chernobyl, is 12 years behind schedule and cost €13.2 billion, quadruple initial estimates.
President Macron hailed the launch as a key step for low-carbon energy and energy security.
Nuclear power, which supplies 60% of France’s electricity, is central to Macron’s plan for a “nuclear renaissance.”
This is “geothermal anywhere”, not bog standard geothermal. They use drilling tech developed by the oil and gas industry to dig far past normal thresholds, making geothermal way more viable.
It’s a pure baseload tech with no nuclear downsides. Current projections are that it could supply roughly 20% of all US power. A perfect compliment to solar/battery, and still faster and cheaper than nuclear, SMR or otherwise.
Still nothing to say about Hanford, huh?