Summary
France’s Flamanville 3 nuclear reactor, its most powerful at 1,600 MW, was connected to the grid on December 21 after 17 years of construction plagued by delays and budget overruns.
The European Pressurized Reactor (EPR), designed to boost nuclear energy post-Chernobyl, is 12 years behind schedule and cost €13.2 billion, quadruple initial estimates.
President Macron hailed the launch as a key step for low-carbon energy and energy security.
Nuclear power, which supplies 60% of France’s electricity, is central to Macron’s plan for a “nuclear renaissance.”
Bro, THE FUCKING BACKUP DIESEL GENERATORS FOR THE PLANT WERE BELOW SEA LEVEL.
Make it make sense. If those generators had been above sea level, well probably above 100-year tsunami levels, we likely would not have seen the plant catastrophically fail.
That was part of the problem. Built where it was cheaper, ignoring literal ancient markers saying not to live there because of the past. But they would have still not failed, had they been designed for the potential of being submerged. Again, they were not because that would cost more for a long range risk. It all falls into bad planning and profit, not in any way because it was a nuclear plant.
bad planning and profit are of course words never uttered in connection with German infrastructure projects.